Worked cases · Singapore

An edge data centre on a warm loop

Two data halls on a chilled-water CRAH fed by a chiller holding 13 °C, a UPS room on a remote condensing unit and an indoor DX unit, and a staffed NOC on a split — held on Singapore's year.

Open the building in the app

Northgate is two data halls with 42 and 28 kW of IT around the clock on a computer-room air handler — a deep coil and a draw-through plug fan, no outside air, the halls' return on the coil — fed by the modular chiller holding 13 °C: a warm loop of the kind TC 9.9's A1 band permits. A UPS room sits on a remote condensing unit and an indoor DX unit cut along the refrigerant lines, and a NOC on the split.

Two things the first run taught: a 90 kW-class chiller ran flat out against 50 + 35 kW of IT, and a well-mixed hall at 25 °C on 14 °C water limits the CRAH to an 18 °C supply — 73 kW against 75 — so the halls hold 26 °C (A1 allows 27) on a 13 °C loop. In winter the indoor unit's economiser holds the UPS room on outside air while the condensing unit idles.

On Singapore's year the building reads 911 MWh of cooling on 260 MWh of electricity, the halls held at 26 °C every hour after the cold-start hour. Until 2 Oct it read 1 015 and 278: the NOC's split cycled through saturated hours, its room's humidity went out as no number at all, and the machine ran flat out all year against a room it could not read — 137 MWh of cooling booked for a room that needs 36.

What it reads on Singapore

Cooling / electricity911 MWh / 260 MWh
Halls26 °C every hour after the cold start
Loop13 °C leaving water — an A1-band warm loop
NOC24.0 °C all year on its split, 36 MWh of cooling (137 booked before the fix of 2 Oct)

What it taught

The machines

Sources

Readings of the shipped model on the building's own PVGIS typical meteorological year; engineering estimates from catalog data and published correlations. The building runs on every plan, including Free, a few times a day.