Operating-suite AHU, 4 m³/s

by HVAC Builder

Open this system in HVAC Builder Load it into the 3D builder, adjust it to your project, and solve it against your own climate — or drop it into a building model and simulate a full year.

An operating-suite air handler: 40 % outside air, a chilled-water coil, an electric heater, a steam humidifier on boiler steam steered to the rooms' humidity floor, and a supply fan against HEPA static. Published as an example; the figures below are solved from this model.

Example30–90 kW coolingEU

Example system. Published by HVAC Builder to show suppliers what their own page looks like. There is no company behind it and it is not a product offer — the specification is generic and the performance is solved from the model on this page.

Design-point performance

84.3 kWcooling
6.0 kWelectrical power
14.00system COP

Solved from this example's own model each time the page loads — the same numbers a supplier's page shows for their machine.

Component schedule

ComponentKindDuty
Outside-air damper: 40 % OA, 24 hdamper0.0 kW
Return damperdamper0.0 kW
Chilled-water coilwaterCoil84.3 kW
Electric preheatheater0.0 kW
Steam humidifier (boiler steam)humidifier-0.0 kW
Supply fan (HEPA)fan-6.0 kW

Are you a manufacturer?

Publish your own range and this slot becomes your branded page — your data, your logo, your product link, and quote requests that reach you. Free to register and free to publish.

Open the Company page How it works